Case Study

EMC Test Chambers Case Study

Source: ETS-Lindgren

ALTER TECHNOLOGY recently decided to expand their EMC test capabilities in Spain and they faced a huge challenge. Their goal was to provide test services for a wide variety of small to large products for their growing customer base. However, the size of the test chamber was constrained by the existing facility. The experts at ETS-Lindgren proposed a solution to maximize the chamber size and performance. Using proprietary modeling tools (numerical simulations to predict RF performance) along with Building Information Modeling (BIM) during the design phase, ETS-Lindgren optimized the chamber configuration not only to fit perfectly into the limited space, but also to maximize the chamber performance beyond the specified requirements. Download the case study for the full story.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of RF Globalnet? Subscribe today.

Subscribe to RF Globalnet X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to RF Globalnet